Starin Road utility work and safe travel alternatives
UW-Whitewater has a number of construction projects underway. These projects are essential to enhance, repair, and maintain infrastructure. One of these projects involves utility work on Starin Road. Construction fencing and signage has been placed to ensure everyone’s safety.
Please stay out of the construction areas and follow the directions posted. For your safety, do not walk in roadways or bike lanes. Please cross roadways in designated crosswalks and use sidewalks (see attached map). The work is expected to continue into the summer.